Asphalt replacement for Alma and Woodvale
Asphalt replacement work will begin Thursday, September 26 in the Alma/Woodvale area and is expected to be completed in two weeks.
The work begins approximately 470 metres south of the intersection of Route 2 and Route 152 and proceeds south on Route 2 for approximately 2,050 metres.
Traffic will be reduced to one-lane, with stop and go in effect for both directions.
Motorists should reduce speed and be prepared to stop. Delays can be expected. Please obey signs and traffic control personnel.
For a map and more information on road construction and road conditions across PEI, visit 511.
Media contact:
Stacey Miller
Department of Transportation and Infrastructure
samiller@gov.pe.ca
Last Updated Date
Wednesday, September 25, 2024 - 4:02pm