Asphalt replacement scheduled for St. Felix

Asphalt replacement work is scheduled for St. Felix starting Friday, September 27 and is expected to take approximately two weeks to complete.

The work begins approximately 360 metres north of the intersection of Route 153 and Little Tignish Road and proceeds north on Route 153 for approximately 1,700 metres.  

Please obey signs and traffic control personnel. Traffic will be reduced to one-lane, with stop and go in effect for both directions.

Motorists should reduce speed and be prepared to stop. Delays can be expected. 

For a map and more information on road construction and road conditions across PEI, visit 511.

Media contact:
Stacey Miller
Department of Transportation and Infrastructure
samiller@gov.pe.ca

Last Updated Date

Wednesday, September 25, 2024 - 3:36pm
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation and Infrastructure
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395


Access PEI/Highway Safety Head Office
33 Riverside Drive
Charlottetown, PE
Phone: 902-368-5200
accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other Transportation and Infrastructure inquiries: DeptTI@gov.pe.ca

Report Transportation Problems

DeptTI@gov.pe.ca