Alerts

Asphalt resurfacing for Goff’s Bridge

Published date: October 17, 2025
Share this page

Asphalt resurfacing for Goff’s Bridge, on Route 12 in Roxbury, will improve the road’s surface and drainage.

Dates: 

Monday, October 20, with work expected to last five weeks.

Traffic: 

Single-lane, alternating traffic will be in effect. 

Vehicles carrying wide loads should take the alternate route of Route 137 (Trout River Route) to Route 2. 

Safety: 

  • Traffic should reduce speed and be prepared to stop.
  • Plan ahead to reach your destination on time.
  • Reduce speed in the area.
  • Obey flaggers and signs.
  • Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law.  

Stay in the loop and plan your route during road construction: 

 

Media contact:
Dan Hodgson
Department of Transportation and Infrastructure 
danmhodgson@gov.pe.ca

 

Last updated date:
General Inquiries

Department of Transportation and Infrastructure

3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Access PEI/Highway Safety Head Office

33 Riverside Drive
Charlottetown, PE

Phone: 902-368-5200

accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: 
roads@gov.pe.ca

Report Transportation Problems