Alerts

Asphalt work scheduled for Colville Road

Published date: September 22, 2026

Work will begin on Colville Road in New Haven and Elmwood to widen approximately 1.4 km of roadway and widen and resurface an additional 1.2 km section.

Work will commence approximately 650 metres south of the intersection of Route 235 and Route 9 and proceed south for a distance of 2.6 km. 

Dates: 

September 23, with work expected to be completed by October 1.

Traffic:

During construction hours, two-way, stop-and-go traffic will be in effect. 

Motorists are advised to expect delays and use caution when traveling through the work zone.

Safety: 

  • Plan ahead to reach your destination on time.
  • Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law. 

Stay in the loop and plan your route during road construction: 

 

Media contact:
Dan Hodgson
Department of Transportation and Infrastructure
danmhodgson@gov.pe.ca

Last updated date:
General Inquiries

Department of Transportation and Infrastructure

3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Access PEI/Highway Safety Head Office

33 Riverside Drive
Charlottetown, PE

Phone: 902-368-5200

accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: 
roads@gov.pe.ca

Report Transportation Problems