Alerts

Asphalt work taking place on Lower Malpeque Road

Published date: September 23, 2026

Asphalt widening and resurfacing is scheduled for a section of Lower Malpeque Road in Milton Station.

Work will commence approximately 70 metres south of the intersection of Route 2 and Lower Malpeque Road and proceed south for a distance of 1.4 km. 

Dates: 

September 25, with work expected to be completed by October 2. 

Traffic:

During construction hours, two-way, stop-and-go traffic will be in effect. 

Motorists can expect delays and should use caution when travelling through the work zone.

Safety: 

  • Plan ahead to reach your destination on time.
  • Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law. 

Stay in the loop and plan your route during road construction: 

Media contact:
Dan Hodgson
Department of Transportation and Infrastructure
danmhodgson@gov.pe.ca

Last updated date:
General Inquiries

Department of Transportation and Infrastructure

3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Access PEI/Highway Safety Head Office

33 Riverside Drive
Charlottetown, PE

Phone: 902-368-5200

accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: 
roads@gov.pe.ca

Report Transportation Problems