Closure of Water Street ramp onto the Hillsborough Bridge

As part of the Stratford sewer line project on the Hillsborough Bridge, the Water Street ramp onto the bridge will be closed starting Monday, November 4. 

To access the bridge, most vehicles will be allowed to turn right at the intersection of Water Street and Route 1 rather than using the ramp. However, large trucks will only be allowed to access the bridge via Grafton Street or Riverside Drive. 

Additional delays are expected on Water Street and drivers are encouraged to choose alternate routes. Slow down in construction zones and follow the directions of traffic control personnel and signs. 

The Water Street ramp will be closed for approximately two weeks. Work on this phase of the Stratford sewer line project on the Hillsborough Bridge is expected to be complete by December.  Work will continue under the bridge through the winter, however this work will have minimal impact on traffic. 

Media contact:
Katie MacDonald
katiemacdonald@gov.pe.ca

Last Updated Date

Friday, November 1, 2019 - 11:42am
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation, Infrastructure and Energy
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Highway Safety/Access PEI Inquiries: accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other TIE inquiries: 

DeptTIE@gov.pe.ca

Report Transportation Problems