Alerts

Coleman Corner Bridge replacement underway

Published date: April 28, 2026

Motorists are advised that the Coleman Corner Bridge, along Route 2 in Coleman Corner (Carleton), is being replaced due to the current structure reaching the end of its service life.

Dates: 

Wednesday, April 29, with construction expected to be completed by December of 2026.

Traffic: 

Vehicles will continue through the site, shifted to one side. Two‑way, two‑lane traffic will be maintained, and traffic control personnel will be present to manage short delays when required. Speed limit will be 30 km/hr and the width restriction is 3.5 m.

Safety: 

  • Plan ahead to reach your destination on time.
  • Reduce speed in the area.
  • Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law. 

Stay in the loop and plan your route during road construction: 

 

Media contact:

Dan Hodgson
Department of Transportation, Infrastructure and Energy
danmhodgson@gov.pe.ca

Last updated date:
General Inquiries

Department of Transportation, Infrastructure and Energy

3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Access PEI/Highway Safety Head Office

33 Riverside Drive
Charlottetown, PE

Phone: 902-368-5200

accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: 
roads@gov.pe.ca

Report Transportation Problems