Hunter River Bridge Replacement

Starting Monday, July 20, all traffic will be directed onto the adjacent temporary bridge, with single lane traffic, alternating one direction at any given time.

Traffic lights on Rte 2 will control traffic flow. Motorists are requested to use caution, proceed slowly, and respect all signage.

This traffic configuration will be in place until the new bridge on Rte 2 is constructed and ready to receive traffic.

Media Contact:
Jill Edwards
Senior Communications Officer
Transportation, Infrastructure and Energy
jedwards@gov.pe.ca

 

Last Updated Date

Friday, July 17, 2020 - 9:51am
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation, Infrastructure and Energy
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Highway Safety/Access PEI Inquiries: accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other TIE inquiries: 

DeptTIE@gov.pe.ca

Report Transportation Problems