Road work in Hunter River

Road work will begin Wednesday, September 6, on Route 2 between Hunter River and Greenvale, PEI.

Construction starts near the main intersection of Hunter River, Route 2 and Route 13, and proceeds easterly along Route 2 for approximately 3.2 kilometres.  

The surface of existing asphalt will be removed and new asphalt seal will be added.

Two-way one-lane stop-and-go traffic will be in effect.

Drivers are asked to obey signs and traffic control personnel, reduce speed and be prepared to stop. Delays can be expected.

For more information on road construction and road conditions across PEI, visit 511.
 
 
Media contact:
Katie Cudmore
Department of Transportation and Infrastructure
katiecudmore@gov.pe.ca
 

 

 

Last Updated Date

Tuesday, September 5, 2023 - 3:34pm
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation and Infrastructure
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395


Access PEI/Highway Safety Head Office
33 Riverside Drive
Charlottetown, PE
Phone: 902-368-5200
accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other Transportation and Infrastructure inquiries: DeptTI@gov.pe.ca

Report Transportation Problems

DeptTI@gov.pe.ca