Alerts

Roseville bridge replacement begins November 2

Published date: October 30, 2026

Work to replace the Roseville Bridge on Route 14 is scheduled to begin November 2, with work expected to be completed by February 26, 2027.

The bridge is being replaced as it has reached the end of its service life.

Traffic:

All traffic will be detoured for the duration of the project, with signage in place to guide motorists along the designated detour route.

Safety: 

  • Plan ahead to reach your destination on time.
  • Reduce speed in the area. 
  • Obey flaggers and signs.
  • Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law. 

Stay in the loop and plan your route during road construction: 

 

Media contact:
Dan Hodgson
Department of Transportation and Infrastructure
danmhodgson@gov.pe.ca

Last updated date:
General Inquiries

Department of Transportation and Infrastructure

3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Access PEI/Highway Safety Head Office

33 Riverside Drive
Charlottetown, PE

Phone: 902-368-5200

accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: 
roads@gov.pe.ca

Report Transportation Problems