Route 1A – Central Bedeque

Construction is underway along Route 1A in Central Bedeque.

Traffic control personnel will be in place to guide motorists in the construction zone. Drivers should be prepared to stop while construction activity is taking place.

During the project, crews will:

• realign the intersection of Route 10 with Route 1A;

• install turn lanes at the intersection of Route 1A, Callbeck Street, and Dunk River Road; and

• repave a section of Route 1A and install a drainage structure on Rayner Road.

Media contact:
Ron Ryder
Department of Transportation, Infrastructure and Energy
rrryder@gov.pe.ca 
(902)368-5112
 

Last Updated Date

Monday, October 24, 2016 - 4:14pm

Alert Severity

Advisory

Alert Type

Traffic

Topics

Roads and Transportation

Department

Highway Maintenance
Transportation, Infrastructure and Energy department logo