Route 2 – Woodvale/St. Peter & St. Paul/Tignish

Work begins 460 metres south of the intersection of Route 152 (Union Road) and proceeds north on Route 2 for a distance of 600 metres.  It then breaks for 500 metres and picks up again 640 metres north of Route 152 (Union Road) and proceeds north for a distance of 4,050 metres. It is a total distance of 5,150 metres, spanning two sections. 

Work includes cold planing (milling) existing asphalt, placing asphalt base and placing asphalt seal. 

Reduce speed. Please obey signs and traffic control personnel. Two-way one-lane stop-and-go traffic will be in effect. 

Traffic should be prepared to stop. Delays can be expected.

Media contact:
Leanne Ritchie
Department of Transportation, Infrastructure and Energy
lpritchie@gov.pe.ca

Last Updated Date

Friday, August 28, 2020 - 9:18am
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation, Infrastructure and Energy
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395

Highway Safety/Access PEI Inquiries: accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other TIE inquiries: 

DeptTIE@gov.pe.ca

Report Transportation Problems