Route 6 Paving, Stanhope

Paving on Route 6 (Eastern Road) in Stanhope begins today, August 3 and is expected to be completed by the end of next week.

Roadwork will take place between Route 25 and the Gulf Shore Parkway East intersection. 

Two-way one-lane stop-and-go traffic will be in effect. Drivers are to reduce speeds, obey signs and traffic control personnel, and be prepared to stop as needed.

Delays can be expected. 

Media Contact:
Vicki Tse
vickitse@gov.pe.ca

Last Updated Date

Wednesday, August 3, 2022 - 10:31am
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation and Infrastructure
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395


Access PEI/Highway Safety Head Office
33 Riverside Drive
Charlottetown, PE
Phone: 902-368-5200
accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other TI inquiries: 

DeptTIE@gov.pe.ca

Report Transportation Problems