Temporary Bridge Morell

Beginning Tuesday, December 7 at 9 am, the temporary bridge on Morell will be reduced to a single lane controlled by traffic lights.

The change is required for winter maintenance operations to avoid vehicle impact with a snow plow during snow removal and salt application on the bridge.

Motorists are advised to use caution entering and driving through the site. It is expected that the temporary bridge will be back to two lanes in April 2022. 

Media contact:
April Gallant
Department of Transportation and Infrastructure
aldgallant@gov.pe.ca

Last Updated Date

Monday, December 6, 2021 - 1:41pm
Transportation, Infrastructure and Energy department logo

General Inquiries

Department of Transportation and Infrastructure
3rd Floor, Jones Building
11 Kent Street,
P.O. Box 2000,
Charlottetown, PE C1A 7N8

Phone: 902-368-5100
Fax: 902-368-5395


Access PEI/Highway Safety Head Office
33 Riverside Drive
Charlottetown, PE
Phone: 902-368-5200
accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

All other TI inquiries: 

DeptTIE@gov.pe.ca

Report Transportation Problems