Renewable energy helps keep energy prices low for Islanders and reduces Prince Edward Island’s need for energy from outside the province. PEI has no local sources of oil, natural gas, or other fuels for traditional forms of electricity. Renewable energy also adds to a cleaner environment because it does not produce emissions or pollution. 

For information on the expansion of the Eastern Kings Wind Farm, visit the PEI Energy Corporation's page.

Renewable Energy (over 1 MW) in Prince Edward Island
NameYearCapacity (MW)LocationOwner
Aeolous Wind20033NorwayPEI Energy Corporation
Eastern Kings Wind Farm200730Elmira/North LakePEI Energy Corporation 
Eastern Kings Phase 2 Wind Farm202529.4ElmiraPEI Energy Corporation
Hermanville/Clear Springs Wind Farm2013-201430HermanvillePEI Energy Corporation
North Cape Wind Farm2001-200310.6North CapePEI Energy Corporation
Norway Wind Park20079NorwayENGIE
Summerside Wind Farm200912SummersideCity of Summerside, 
Summerside Electric
West Cape Wind Park2007-200999West CapeENGIE
WEICan Wind R&D Park201310North CapeWEICan
Slemon Park Solar Farm202410SummersidePEI Energy Corporation
Summerside Sunbank202421.6SummersideCity of Summerside

Is all of PEI’s renewable energy used by Islanders?

The majority of the time the Renewable Energy produced on the Island is used on the Island.  There are several times a year when PEI is producing more renewable energy than the base load on the Island and therefore PEI becomes an energy exporter.  All of the energy from the PEI Energy Corporation Wind and Solar Farms is sold to Maritime Electric for use by Islanders and more than half of the Island's 204 MW of wind capacity is used by Island utilities.

See how much of PEI’s energy is produced from renewable energy

How is renewable energy affected if the wind doesn’t blow or the sun doesn’t shine?

The wind doesn’t blow all the time; when it does, sometimes it's at a speed that is not fast enough for wind turbines to work at their peak capacity. There are even times when the wind blows so strongly that the turbines shut down to protect themselves.

Similarly, the sun doesn’t shine all the time however both Slemon Park Solar Farm and Summerside Sunbank have integrated battery storage and can store up to 21.5 megawatt-hours combined to help the utilities manage peak loads.

Who can I contact for more information on wind energy?

PEI Energy Corporation

Email: PEIEnergyCorp@gov.pe.ca 

Telephone: 902-894-0288

Fax: 902-894-0290

General Inquiries

PEI Energy Corporation

PO Box 2000
Charlottetown, PE C1A 7N8

Phone: 902-894-0288
Fax: 902-894-0290