Search
Results displayed are the past two years only, search News Archives for older releases.
Displaying 1 - 10 of 28.Results
Hillsborough Bridge and Riverside Drive intersection improvements nearing completion
2024-11-26
Upgrades to the Hillsborough Bridge and Riverside Drive intersection in Charlottetown are nearing the final stages, with paving expected to finish within the next three days.
During the busiest travel times, all lanes on the bridge will remain open travelling from Stratford to Charlottetown...
New Cains Bridge open to traffic
2024-11-25
The new Cains Bridge on Route 2 near Bloomfield Provincial Park is now open to all traffic.
Construction activity will still be present on site with the removal of the temporary bridge.
Motorists are advised to use caution when entering and driving through the site.
For a map and more...
Newton Bridge replacement to begin November 21
2024-11-20
Replacement of the Newton Bridge on Route 111 in Newton has begun and is expected to be completed by March 15, 2025.
All traffic will be detoured for the duration of the project.
The replacement of the bridge is due to the end of the structure’s service life.
For a map and more information on...
Haywood Road bridge replacement begins November 14
2024-11-12
Replacement of the Haywood Road bridge in Tignish will begin Thursday, November 14.
Work is expected to be completed by February 28, 2025.
The existing bridge will be replaced due to the structure nearing the end of its service life.
All traffic will be detoured for the duration of the project...
Weight restriction in effect for Hebron Road bridge
2024-11-08
Effective immediately, traffic on the Hebron Bridge will be restricted to vehicles weighing no more than 5,500 kg.
This limitation is due to the bridge’s age and current condition. The bridge is located on a seasonal road with light traffic and is not plowed during the winter months.
For a map...
Traffic detours in effect during Doyles Bridge replacement project
2024-11-06
Replacement of Doyles Bridge in Tignish has begun and is expected to be completed by March 28, 2025.
The existing bridge, which was built in 1953, will be replaced due to the structure nearing the end of its service life.
The new bridge will be 27.5 metres long.
All traffic will be detoured for...
Road closure for Sheppard Road in Cardross
2024-10-31
Sheppard Road (Route 321) in Cardross will be closed to through traffic to replace a roadway culvert on Friday, November 1.
The closure is between Route 4 and the Cardigan Road. The road is expected to be reopened by the end of the day.
Local traffic only will have access to Cardigan Road during...
Traffic lights shut down temporarily in Charlottetown
2024-10-29
The traffic lights at the intersection of Riverside Drive and Grafton Street in Charlottetown will be off on Wednesday, October 30, from 9 a.m. to 3 p.m.
During this time, traffic will be managed by personnel on site.
Drivers are asked to be careful and follow their instructions.
This shutdown...
Asphalt replacement for Pleasant Valley
2024-10-23
Asphalt replacement will begin Thursday, October 24 in Pleasant Valley at the intersection of Route 2 and Inkerman Road and proceeds east on Route 2 for approximately 1.1 km.
The work is expected to take two days.
Please obey signs and traffic control personnel.
The route will be reduced to one...
Roadwork for Mount Albion
2024-10-21
Roadwork is set to begin on the Route 1 (Trans-Canada Highway) and Route 5 (48 Road) intersection in Mount Albion on Tuesday, October 22 and is expected to wrap up in mid-November.
Work consists of realigning the Route 5 to Route 1 right-turn ramp, road widening for a left-turn lane into the...