TIE- Bideford Bridge - Structure Replacement
The scope of this work includes, but is not necessarily limited to the following: the supply of all labour,
equipment, and materials necessary to completely replace the existing bridge structure with a new
bridge structure. The work on this project shall consist of but not limited to: temporary bypass road
construction and maintenance; traffic control; excavation; slope protection; environmental controls;
asphalt excavation; cold plane and stockpile asphalt; reclaimed asphalt placement and maintenance;
demolition and removal of existing structure; new pipe structure; rip rap; temporary bridge placement
and eventual removal; temporary bypass road removal; road work complete with asphalt paving; and
all other ancillaries required to completely install the structure to the satisfaction of the Owner.