Assistance with moving farm equipment over the Hillsborough Bridge 

Le contenu suivant est seulement disponible en anglais.

While the Hillsborough Bridge is under construction for the Stratford sewer line project, provincial road crews will assist farmers and others who need to move wide loads and larger equipment across the bridge.

Anyone who needs to move a wide load over the bridge can contact bridge traffic control at 902-214-0874 or Queen’s County Highway Maintenance dispatch at 902-368-4770. 

Traffic control staff will plan for the arrival, adjust lanes, and assist with moving the load safely through the construction site.  Pre-planning these operations will minimize traffic impacts for all drivers. 

Work is expected to be complete on this construction phase by December.  Work will continue under the bridge through the winter, however this work will have minimal impact on traffic. 

Media contact:
Katie MacDonald
katiemacdonald@gov.pe.ca
 

Dernière mise à jour

lundi 28 Octobre 2019, 11 h 40
Transports, Infrastructure et Énergie

Renseignements généraux

Ministère des Transports, de l’Infrastructure et de l’Énergie
Immeuble Jones, 3e étage
11, rue Kent
C.P. 2000
Charlottetown (Î.-P.-É.) C1A 7N8

Téléphone : 902-368-5100
Télécopieur : 902-368-5395

DeptTIE@gov.pe.ca

Report Transportation Problems