Tie - Inverness Bridge - Structure Replacement (District 25)
INVERNESS BRIDGE - STRUCTURE REPLACEMENT
DISTRICT 25
The scope of this work includes, but is not necessarily limited to the following: the supply of
all labour, equipment, and materials necessary to completely replace the existing bridge
structure with a new bridge structure. The work on this project shall consist of traffic control;
excavation; slope protection; environmental controls; cold plane and stockpile asphalt;
reclaim ed asphalt placement and maintenance; demolition and rem oval of existing
structure; concrete form work and accessories; concrete reinforcement; cast-in-place concrete;
pre-cast concrete structure installation; waterproofing
membrane; new timber structure; structural steel barrier; pre-cast concrete retaining wall; rip rap; gabion baskets; temporary box culvert bridge and bypass road within the site; temporary traffic lane road setup and maintenance; road work complete with asphalt paving; and all other ancillaries required to completely install
the structure to the satisfaction of the Owner.
TENDER CLOSES: Friday, 26 June 2015, 2:00 PM
11 Kent Street
3rd Floor Jones Building
Charlottetown, PEI
Personne-ressource de l’organisme: