TIE- Hillsborough Bridge - Structural Steel Strengthening
Le contenu suivant est seulement disponible en anglais.
Numéro d’appel d’offres:
4843
Date de publication:
vendredi 11 Août 2017
Date de fermeture:
mercredi 6 Septembre 2017, 11 h 00
Type d’appel d’offres:
Avis d’appel d’offres (AAO)
Type d’entente:
Appel d’offres ouvert (AOO)
Valeur estimative:
Non déterminée
Notes:
The scope of this work includes, but is not necessarily limited to the following: the supply of all labour,
equipment, and materials necessary to completely strengthen the structural truss members as identified
in the tender documents and drawings, including; but, not limited to; general mobilization; scaffolding
design and erection; supply of structural plate; environmental controls; existing steel member
preparation; field drilling holes; structural steel plate installation; field bolting; field welding; surface
preparation, coating application, final clean up and all other ancillaries required to complete the work
to the satisfaction of the Owner.
Organisme:
Transports, Infrastructure et Énergie
Personne-ressource de l’organisme:
Erika Bell
Téléphone:
(902) 368-6095
Télécopieur:
(902) 368-5425
Document de la demande de prix: