Emma Drive Subdivision - Phase III - 2018 - Alberton, PEI

Le contenu suivant est seulement disponible en anglais.
Numéro d’appel d’offres: 
ALB-2018-01
Date de publication: 
vendredi 31 Août 2018
Date de fermeture: 
vendredi 7 Septembre 2018, 14 h 00
Type d’appel d’offres: 
Demande de prix (DP)
Valeur estimative: 
Non déterminée
Catégorie d’appel d’offres
Infrastructure - construction, rénovation, réparation et démolition
Notes: 

The project involves the construction of three new street segments of approximately 700 meters in total length at the project location on Emma Drive and Weeks Drive in the Town of Alberton. The work also includes approximately 480 meters of sanitary sewer system, sewer servicing for 30 lots, storm drainage system complete with drainage swale and berms, and storm mains of approximately 225 meters in length, storm drainage system, catchbasins, sod and rock lining structure outletting to Alberton Creek.

Specifications, Plans and Tender Forms may be obtained at the office of the Engineers, WSP Canada Inc., 195 MacEwen Road, Summerside, P.E.I. A Non-Refundable Deposit of $50.00 per set will be required and made payable to

“TOWN OF ALBERTON.” Lowest or any tender not necessarily accepted.

Organisme: 
Village d'Alberton

Personne-ressource de l’organisme:

Susan Wallace-Flynn
Téléphone: 
(902) 853-2720