St. Teresa Bridge- Structure Replacement

Le contenu suivant est seulement disponible en anglais.
Numéro d’appel d’offres: 
PEIG-DTI-5800
Date de publication: 
mercredi 22 Septembre 2021
Date de fermeture: 
jeudi 7 Octobre 2021, 14 h 00
Type d’appel d’offres: 
Avis d’appel d’offres (AAO)
Type d’entente: 
Appel d’offres ouvert (AOO)
Valeur estimative: 
Non déterminée
Catégorie d’appel d’offres
Matériaux de construction
Notes: 

The scope of this work includes, but is not necessarily limited to the following:  the supply of all labour, equipment, and materials necessary to completely replace the existing bridge structure with a new bridge structure.  The work on this project shall consist of but not limited to: excavation; slope protection; environmental controls; cold plane and stockpile asphalt;  demolition and removal of existing structure; installation of new pipe structure; supply, placement and compaction of backfill against structure; select borrow; base gravels; rip rap; road work complete with asphalt paving; and all other ancillaries required to completely install the structure to the satisfaction of the Owner. 

Organisme: 
Transports et Infrastructure
Personne-ressource pour l’approvisionnement
Andrew Murphy