Little Harbour Bridge- Structure Replacement

Le contenu suivant est seulement disponible en anglais.
Numéro d’appel d’offres: 
PEIG-TIE-4937
Date de publication: 
vendredi 18 Juin 2021
Date de fermeture: 
jeudi 8 Juillet 2021, 14 h 00
Type d’appel d’offres: 
Avis d’appel d’offres (AAO)
Type d’entente: 
Appel d’offres ouvert (AOO)
Valeur estimative: 
Non déterminée
Catégorie d’appel d’offres
Matériaux de construction
Notes: 

The scope of this work includes, but is not necessarily limited to the following: the supply of all labour, equipment, and materials necessary to completely replace the existing bridge structure with a new bridge structure. The work on this project shall consist of but not limited to: temporary bypass road construction and maintenance; traffic control; excavation; slope protection; environmental controls; asphalt excavation; cold plane and stockpile asphalt; reclaimed asphalt placement and maintenance; demolition and removal of existing structure; steel piles; concrete formwork and accessories; concrete reinforcement; cast-in-place concrete; precast concrete girders; concrete deck; GFRP reinforcement; waterproofing membrane; rip rap; HDPE pipe structure; temporary steel sheet piling; temporary cofferdam; temporary bridge; road work complete with asphalt paving; and all other ancillaries required to completely install the structure to the satisfaction of the Owner. 

Organisme: 
Transports et Infrastructure
Personne-ressource pour l’approvisionnement
Neil Lawless
Document de la demande de prix: