Head of Montague Bridge - Structure Replacement

Le contenu suivant est seulement disponible en anglais.
Numéro d’appel d’offres: 
PEIG-TIE-5046
Date de publication: 
vendredi 27 Juillet 2018
Date de fermeture: 
mardi 14 Août 2018, 14 h 00
Type d’appel d’offres: 
Avis d’appel d’offres (AAO)
Type d’entente: 
Appel d’offres ouvert (AOO)
Valeur estimative: 
Non déterminée
Catégorie d’appel d’offres
Matériaux de construction
Notes: 

The scope of this work includes, but is not necessarily limited to the following: the supply of all labour,
equipment, and materials necessary to completely replace the existing bridge structure with a new
bridge structure. The work on this project shall consist of but not limited to: excavation; slope
protection; environmental controls; asphalt excavation; cold plane and stockpile asphalt; demolition
and removal of existing structure; new pipe structure; rip rap; road work complete with asphalt paving;
and all other ancillaries required to completely install the structure to the satisfaction of the Owner.

Organisme: 
Transports, Infrastructure et Énergie

Personne-ressource de l’organisme:

Neil Lawless
Téléphone: 
(902) 620-3563
Télécopieur: 
(902) 368-5425
Document de la demande de prix: