South Freetown Bridge- Structure Replacement
The scope of this work includes, but is not necessarily limited to the following: the supply of all labour, equipment, and materials necessary to completely replace the existing bridge structure with a new bridge structure. The work on this project shall consist of but not limited to: excavation; slope protection; environmental controls; asphalt excavation; cold plane and stockpile asphalt; stream diversion; stream containment; demolition and removal of existing structure; concrete formwork and accessories; concrete reinforcement; precast concrete; precast concrete structure installation; waterproofing membrane; structural steel barrier; precast concrete retaining wall; rip rap; road work complete with asphalt paving; and all other ancillaries required to completely install the structure to the satisfaction of the Owner.