Cornwall Wastewater System Upgrades-Phase II (Outflow & Flow Monitoring Upgrades)
Le contenu suivant est seulement disponible en anglais.
Numéro d’appel d’offres:
TOC-Infra-2019-05
Date de publication:
vendredi 25 Octobre 2019
Date de fermeture:
vendredi 8 Novembre 2019, 12 h 00
Type d’appel d’offres:
Demande de propositions (DDP)
Type d’entente:
Appel d’offres ouvert (AOO)
Valeur estimative:
Non déterminée
Notes:
SEALED TENDERS will be received by the Town of Cornwall at the Town Office located at 39
Lowther Drive, Cornwall, PEI, until 12:00:00 PM (Noon), Friday, November 8th, 2019, for the construction of:
Cornwall Wastewater System Upgrades – Phase II Outflow & Flow Monitoring Upgrades Cornwall, PEI
The project involves the dewatering of the North River Lagoon to facilitate the replacement of the outfall, and the installation of a control valve and metering chamber. The work also involves the installation of a flow meter in an existing structure at the Cornwall Lagoon.
Lowest or any tender not necessarily accepted
Organisme:
Town of Cornwall
Personne-ressource de l’organisme:
WSP-Luc Van Hul
Téléphone:
(902) 436-2669
Appui: