Annual Electrical Permit Application Form
Electrical permits are required for all electrical work on PEI.
for "finance pei about"
Electrical permits are required for all electrical work on PEI.
Annual Report for the PEI Housing Corporation for the 2022-2023 fiscal year.
Statistics report on PEI municipalities for 2012-2013, which contains information on demographics and geography, tax rates, municipal assessments, financial information, and municipal services.
De nouvelle bases - Rapport de la Commission pour l'amenagement du territoire et pour la governance locale, Decembre 2009
Annual Report for the PEI Housing Corporation for the 2020-2021 fiscal year.
Annual Report for the PEI Housing Corporation for the 2018-2019 fiscal year.
A permit is needed to install or alter any boiler or pressure vessel, which is not housed in a private residence, for any of the following: Power (usually steam) boilers above 10 kw (34,152 BTUs) operating at 103 kPa (15 psi) or above, Heating (hot water or biomass) boilers above 20 kw (68,304 BTUs) operating at 201 kPa (30 psi) or above, or Pressure vessels with an internal diameter of more than 152.4 mm (6 inches) operating at 103 kPa (15 psi) or above. A permit is not required to install or alter a boiler or pressure vessel that is not under pressure or is vented to the atmosphere. Am I...
Annual Report of the Prince Edward Island Housing Corporation for the year ending March 31, 2015