Alerts
Brae Harbour Road bridge being replaced
Published date:
November 20, 2025
Crews will be replacing the Brae Harbour Road bridge on Route 170 due to the current structure reaching the end of its service life.
Dates:
Monday, November 24, with completion expected by late January of 2026.
Traffic:
All traffic will continue through the site during the construction.
Traffic will move in both directions using a single lane, with stop-and-go signals controlling when vehicles can take their turn.
Safety:
- Motorists should reduce speed and be prepared to stop.
- Plan ahead to reach your destination on time.
- Reduce speed in the area.
- Obey flaggers and signs.
- Remember, speeding and using your phone while driving, even when you’re waiting in traffic, are against the law.
Stay in the loop and plan your route during road construction:
- PrinceEdwardIsland.ca/PlanYourRoute
- Road construction map Prince Edward Island 511
- Follow PEIPublicSafety on Facebook
Media contact:
Dan Hodgson
Department of Transportation and Infrastructure
danmhodgson@gov.pe.ca
Last updated date: