News

New traffic lights being installed in Hunter River

May 20, 2025
Share this page

New traffic lights at the Route 2 and Route 13 intersection will be activated next month to help improve traffic flow and safety. Drivers are advised to prepare for the upcoming change.

The lights will be in operation from spring to fall, to improve safety and traffic flow during periods of higher traffic volume. They will be turned off from November to May due to traction and stopping challenges in winter weather for drivers coming down the steep hill on Route 2. 

To inform drivers about the new lights, there will be a signalized intersection warning sign placed on the road.

Drivers crossing or turning onto Route 2 often have long waits, especially during the summer months when traffic volume increases. Traffic lights regulate traffic flow and provide predictability, so drivers are less likely to take risks trying to beat gaps in traffic. 

To help Islanders and all road users prepare for the busy road construction season,  construction projects are being shared with the public early to ensure everyone can plan their routes and organize their daily activities effectively. 

Visit PrinceEdwardIsland.ca/PlanYourRoute for information about seasonal road construction projects and find other information to help you stay in the loop and plan your route.

Media contact:

Dan Hodgson 

Department of Transportation and Infrastructure

danmhodgson@gov.pe.ca

 

General Inquiries

Department of Transportation and Infrastructure

3rd Floor, Jones Building

11 Kent Street,

P.O. Box 2000,

Charlottetown, PE C1A 7N8

Phone: 902-368-5100

Fax: 902-368-5395

Access PEI/Highway Safety Head Office

33 Riverside Drive

Charlottetown, PE

Phone: 902-368-5200

accesspeicharlottetown@gov.pe.ca

Road-Related Inquiries: roads@gov.pe.ca

Report Transportation Problems