Mechanical Contractor's Licence Application Form
You must complete an application and forward it, together with the appropriate fee, to the department.
for "all all p"
You must complete an application and forward it, together with the appropriate fee, to the department.
A Returning Officer must make a declaration in front of the Municipal Electoral Officer (MEO) that they will faithfully and impartially perform their duties in the administration of the election.
Anyone who operates a power heating or refridgeration plant, which requires operators as outlined in the Power Engineers Act and regulations, must hold a Power Engineers License of the appropriate class.
Home heat tank means an above ground petroleum storage tank that has a capacity of 2200 litres or less, is installed in a fixed location and is connected or intended to be connected to oil burning equipment. Only a licensed installer can install, alter, or remove a home heat tank...
The Statement of the Vote is filled out the by the Deputy Returning Officer after the votes are counted.
Application Form for a Plumbing Contractor License.
You need to have a Septic Contractor License to install or repair an on-site sewage disposal (septic) system.
Annual Report of the Prince Edward Island Housing Corporation for the year ending March 31, 2015
To help users get the most out of the Municipal Inv